Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Asia-Pacific growth outlook lifted to 5% for 2026

    September 24, 2026

    13th Silk Road International Film Festival Concludes in Xi’an with Golden Silk Road Awards Announced

    September 24, 2026

    UAE joins Trump meeting on Middle East security in New York

    September 23, 2026
    Aljazair TimesAljazair Times
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Aljazair TimesAljazair Times
    Home » First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction
    PR Newswire

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    October 20, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    BEIJING, Oct. 20, 2023 /PRNewswire/ — JA Solar recently announced that the first phase of its Baotou Manufacturing Base 50MW Rooftop Distributed Photovoltaic (PV) Project has started construction. The project is believed to be an important step in promoting company-wide green production and operations.

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    With an investment of RMB150 million, the project will be constructed in four phases, and it is expected to be completed by the end of 2023. Installed with JA Solar n-type DeepBlue 4.0 modules, the project is expected to generate 65 million kWh of electricity per year, equivalent to a yearly carbon emission reduction of 54,000 tons. It has been commented by local media that the project will become a model in promoting the application of solar PV in the local area.

    JA Solar always adheres to the concept of sustainable development. JA Solar practices the concept of low-carbon development in its operations, and has built up a green manufacturing ecosystem. As of February 2023, six of JA Solar’s manufacturing bases have been listed in the Ministry of Industry and Information Technology (MIIT)’s “green factories” list. Earlier this year, the n-type products of JA Solar were awarded the carbon footprint PPE2 certification by the French authority Certisolis, which indicates that JA Solar is among the first batch of PV module manufacturers to obtain the French carbon footprint certification under the new PPE2 standard, and demonstrates the low-carbon competitiveness of JA Solar’s n-type products.

    Photo – https://mma.prnewswire.com/media/2252851/image_1.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/first-phase-of-ja-solar-baotou-manufacturing-base-50mw-rooftop-pv-project-starts-construction-301963021.html

    Related Posts

    13th Silk Road International Film Festival Concludes in Xi’an with Golden Silk Road Awards Announced

    September 24, 2026

    Co-Creating Future Transit Value: CRRC Brings Three Full-Size Trains and End-to-End Solutions to InnoTrans 2026

    September 23, 2026

    China Daily: Chinese farming model offers practical lessons for Global South

    September 21, 2026

    Binance Launches Foreign Exchange Perpetual Futures, Expanding 24/7 Access to the Largest Financial Market

    September 18, 2026

    Skye Africa Intelligence Commissioned to Develop SafariOS Hospitality Concierge in Tanzania

    September 18, 2026

    Jiahui Health Highlights China’s Growing Role in Global Medical Tourism at WTO Public Forum 2026

    September 18, 2026
    Editor's Pick

    Asia-Pacific growth outlook lifted to 5% for 2026

    September 24, 2026

    UAE joins Trump meeting on Middle East security in New York

    September 23, 2026

    Egypt overseas transfers total $29.7 billion through July

    September 22, 2026

    Typhoon Dujuan brings flood risk and travel disruption

    September 21, 2026

    China keeps loan prime rates steady through September 2026

    September 21, 2026

    Rare EGFR mutation raises lung cancer risk 60 times in data

    September 19, 2026

    Nepal flood missing count rises to 6,150 after verification

    September 17, 2026

    WHO reports Ebola progress as DR Congo outbreak continues

    September 17, 2026
    © 2026 Aljazair Times | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.